
- Χώρα
- State of Qatar
- Τοποθεσία
- Doha
- Επιφάνεια
- 4,850 m²
- Υπηρεσία
- Industrial Concrete Flooring
- Τύπος δαπέδου
- FM2
- Έτος
- 2018
The Qatar Port Re-Development project at Mina Cut Basin represented a critical infrastructure upgrade in Doha, requiring a high-performance industrial floor capable of withstanding the rigors of a busy maritime logistics hub. The primary challenge was the scale and location of the project; 4,850 square meters of concrete had to be laid to precise specifications within a challenging coastal environment where humidity and temperature fluctuations can compromise concrete curing and finishing.
Furthermore, the client required an FM2 classification according to TR34 standards. Achieving this level of flatness and levelness is essential for high-clearance logistics and heavy-duty machinery operations, but it demands rigorous control over the pouring and finishing processes. Any deviations beyond the strict FM2 tolerances would lead to operational inefficiencies and increased wear on port equipment, making precision the top priority for this coastal redevelopment.
