OSIS GROUP
Όλα τα έργα

Industrial Concrete Flooring

Logistics Village Phase 5

Logistics Village Phase 5
Χώρα
State of Qatar
Τοποθεσία
Doha
Επιφάνεια
46,000 m²
Υπηρεσία
Industrial Concrete Flooring
Τύπος δαπέδου
DM2
Έτος
2016

The Logistics Village Phase 5 for Gulf Warehousing Company (GWC) in Doha represented a major expansion of one of the region's most critical logistics hubs. The primary challenge was the scale of the facility, covering 46,000 m², which needed to be engineered to support high-intensity logistics operations including high-reach racking and heavy forklift traffic.

The client required a Direct Finished Floor (DM2) classification according to TR34 standards. Achieving this level of flatness over such a vast area in the demanding climate of Doha was complex. The project demanded rigorous temperature control of the concrete and high-performance joint detailing to prevent long-term maintenance issues under the weight of constant vehicular movement within the warehouse.

Ας χτίσουμε κάτι μαζί

Έχετε έργο βιομηχανικού δαπέδου ή κατασκευής; Επικοινωνήστε με την τεχνική μας ομάδα.

Ζητήστε προσφορά