OSIS GROUP
Όλα τα έργα

Industrial Concrete Flooring

GWC Logists Park Phase 1

GWC Logists Park Phase 1
Χώρα
State of Qatar
Τοποθεσία
Doha
Επιφάνεια
40,200 m²
Υπηρεσία
Industrial Concrete Flooring
Τύπος δαπέδου
DM1
Έτος
2021

The GWC Logistics Park Phase 1 project in Doha required the construction of a high-performance industrial floor spanning 40,200 m². The primary challenge was the client's requirement for a DM1 (Direct Medium Shuttles) classification according to TR34 standards. This classification is exceptionally demanding, requiring extreme precision in floor flatness and levelness to facilitate high-speed, automated warehouse operations.

Achieving such tight tolerances over a vast footprint in Doha's challenging climatic conditions added a layer of complexity. The project required meticulous planning to manage heat-related concrete curing issues while ensuring the structural integrity was sufficient to support the heavy racking loads and high-frequency traffic inherent in modern logistics hubs.

Ας χτίσουμε κάτι μαζί

Έχετε έργο βιομηχανικού δαπέδου ή κατασκευής; Επικοινωνήστε με την τεχνική μας ομάδα.

Ζητήστε προσφορά