OSIS GROUP
Όλα τα έργα

Industrial Concrete Flooring

GWC Warehouse at RLIC SI-14

GWC Warehouse at RLIC SI-14
Χώρα
State of Qatar
Τοποθεσία
Doha
Επιφάνεια
12,000 m²
Υπηρεσία
Industrial Concrete Flooring
Τύπος δαπέδου
DM2
Έτος
2019

Gulf Warehousing Company (GWC) required a high-specification logistics facility at the Ras Laffan Industrial City (RLIC) SI-14 plot to support its growing supply chain operations. The primary challenge was the requirement for a 12,000 m² floor that met the stringent DM2 (Defined Movement) classification as per the TR34 4th Edition standards. This classification is vital for Very Narrow Aisle (VNA) warehouses where high-level racking systems demand exceptional floor flatness and levelness to ensure the safe and efficient operation of MHE (Material Handling Equipment).

The project was further complicated by the demanding environmental conditions of Doha, where high ambient temperatures can significantly affect concrete setting times and workability. Maintaining the precise tolerances required for DM2 longitudinal and transverse tight-radius measurements meant there was zero margin for error during the pouring and finishing phases. Any deviation would not only compromise operational safety but also lead to premature wear and tear on the warehouse fleet.

Ας χτίσουμε κάτι μαζί

Έχετε έργο βιομηχανικού δαπέδου ή κατασκευής; Επικοινωνήστε με την τεχνική μας ομάδα.

Ζητήστε προσφορά