
- Χώρα
- State of Qatar
- Τοποθεσία
- Doha
- Επιφάνεια
- 15,000 m²
- Υπηρεσία
- Industrial Concrete Flooring
- Τύπος δαπέδου
- DM1
- Έτος
- 2025
GWC (Gulf Warehousing Company) required an exceptional high-specification flooring solution for their warehouse facility at Ras Laffan Industrial City (RLIC) SI-16 in Doha. The primary challenge was the requirement for a DM1 (Defined Movement) floor classification as per TR34 standards. This category of floor is the most stringent in the industry, typically reserved for Very Narrow Aisle (VNA) warehouses where racking heights exceed 13 metres.
The 15,000 m² project demanded near-perfect levelness and flatness to ensure the safe and efficient operation of automated high-reach trucks. Any slight deviation in the floor's surface could lead to 'mast sway,' potentially causing collisions with racking or significant operational downtime. Executing such precision over a large scale in the demanding climate of Doha required rigorous environmental control and technical mastery.
