
- Χώρα
- KSA
- Τοποθεσία
- Riyadh
- Επιφάνεια
- 16,500 m²
- Υπηρεσία
- Industrial Concrete Flooring
- Τύπος δαπέδου
- FM2
- Έτος
- 2016
Almarai, a global leader in the food and beverage industry, required a high-specification industrial floor for their Central Processing Plant (CPP) in Riyadh. The facility demanded a flooring solution that could withstand heavy-duty logistical operations and high-traffic pallet movements while maintaining strict hygiene standards. The project’s complexity was heightened by the vast scale of the 16,500 m² footprint and the need for precision leveling to support efficient automated storage and retrieval systems.
A primary challenge was ensuring the floor met the stringent FM2 (Special) classification as per the TR34 guidelines. Achieving this level of flatness over such a large area requires exceptional workmanship and environmental control to prevent floor curling, surface irregularities, or structural cracking. Furthermore, the installation had to be executed within a tight construction schedule to allow for the subsequent installation of processing machinery and racking systems without delay.
